Wind Turbine Repowering Project: The IBEW Boston Case Study

Discover how Northern Power Systems transformed an unsupported wind turbine at the IBEW Training Center in Boston through a customized repowering project. By reusing existing infrastructure and installing the NPS100C, the project was completed in just one week and achieved 99.9% operational availability and a 106.2% Performance Factor.
Wind Turbine Repowering Project: The IBEW Boston Case Study
An aging wind turbine does not always need to be decommissioned. The IBEW Electrical Industry Training Center in Boston demonstrates how a wind turbine repowering project can transform an unsupported turbine into a modern, reliable, and high-performing renewable energy asset. By combining the NPS100C platform with a customized engineering solution, Northern Power Systems was able […]