Refurbished units
Decommissioning & Refurbishment
Maximize value from aging wind assets. Professional decommissioning, repowering with modern NPS turbines, or refurbishment to extend operational life.
Industry Challenge
The Challenge of Aging Wind Assets
As wind turbines approach end-of-life, asset owners face difficult decisions about decommissioning, repowering, or life extension.
Parts & Service Challenges
OEM support ends, spare parts become scarce, and maintenance costs escalate for legacy turbines.
Regulatory Compliance
End-of-life obligations require proper decommissioning plans and environmental remediation.
Aging Fleet Performance
Older turbines suffer declining availability, increased maintenance costs, and reduced energy yield.
Stranded Asset Risk
Underperforming assets tie up capital and land that could generate higher returns with modern equipment.
Our Solution
End-of-Life Asset Options
Comprehensive services for every stage of wind asset lifecycle management
Full Decommissioning
Complete turbine removal, site restoration, and component recycling for end-of-life wind farms.
- Turbine dismantling & removal
- Foundation removal or capping
- Site restoration
- Component recycling (90%+ rates)
Repowering
Replace aging turbines with modern NPS technology to maximize site potential and extend asset life.
- Site assessment & redesign
- Legacy turbine removal
- New turbine installation
- Grid upgrade support
Refurbishment
Extend turbine life with major component upgrades, drivetrain rebuilds, and control system modernization.
- Major component replacement
- Drivetrain refurbishment
- Control system upgrades
- Performance optimization
Repowering Advantage
Unlock Your Site's Full Potential
Repowering replaces aging turbines with modern NPS technology, dramatically increasing energy production while leveraging existing infrastructure, permits, and grid connections.
Modern turbines produce 2-3x more energy from the same site, with higher reliability, lower maintenance costs, and 25+ year operational life.
2-3x Energy Yield
Modern turbines produce significantly more energy from the same site
Extended Asset Life
New 25+ year operational horizon with full warranty coverage
Lower LCOE
Reduced levelized cost of energy improves project economics
ESG Compliance
Meet sustainability commitments with responsible decommissioning
Our Process
Asset Lifecycle Management Process
A structured approach to maximize value from your wind assets
01
Assessment
Evaluate existing assets, site potential, and options
02
Planning
Develop decommissioning, repowering, or refurbishment plan
03
Permitting
Handle regulatory approvals and compliance
04
Execution
Implement the chosen solution safely and efficiently
05
Handover
Complete site restoration or new asset commissioning
Proven Results
Asset Lifecycle Case Studies
Real-world examples of successful turnkey wind project delivery
100 kW
Wind Turbine for a Parking Lot
Configuration: 1 NPS 100C – 27 – 37
Result: delivered in 6 months
10% annual savings
100 kW
Wind Turbine for a Parking Lot
Configuration: 1 NPS 100C – 27 – 37
Result: delivered in 6 months
10% annual savings
100 kW
Wind Turbine for a Parking Lot
Configuration: 1 NPS 100C – 27 – 37
Result: delivered in 6 months