Full Project Delivery

Turnkey Wind Projects

End-to-end wind farm delivery from site assessment to commissioning — one partner, one responsibility, guaranteed performance.

Industry Challenge

The Complexity of Wind Project Development

Traditional wind project approaches create coordination challenges that increase risk, cost, and schedule uncertainty.

Multiple Contractor Coordination

Managing separate EPC firms, equipment vendors, and grid operators creates complexity and delays.

Risk & Liability Gaps

Interface risks between contractors lead to finger-pointing and cost overruns when issues arise.

Schedule Uncertainty

Fragmented project management often results in delays and missed commercial operation dates.

Hidden Costs

Budget overruns from unforeseen coordination issues, change orders, and scope gaps.

Our Solution

Single Point of Responsibility

NPS delivers complete wind farm projects with a single point of responsibility. From initial site assessment to final commissioning, we handle every aspect of development, ensuring on-time, on-budget delivery with contractually guaranteed performance.

Reduced Risk

Eliminate interface risks with single-source accountability

Performance Guaranteed

Contractual guarantees on output, availability, and timeline

On-Time Delivery

Proven track record of meeting COD commitments

Our Process

Turnkey Delivery Methodology

A proven methodology delivering wind projects on time and on budget

01

Site Assessment

Wind resource analysis, feasibility study, and site optimization

02

Engineering

Complete project design, permitting, and grid studies

03

Procurement

Equipment sourcing, supply chain, and logistics

04

Construction

Civil works, installation, and grid connection

05

Commissioning

Testing, performance validation, and handover

Proven Results

Turnkey Project Case Studies

Real-world examples of successful turnkey wind project delivery

100 kW

Wind Turbine for Girvan Community Hospital

Configuration:  1 NPS 100C – 21 – 37

Result: The turbine generates an average of 200,000 kWh annually, offsetting approximately 66% of the hospital’s total demand.

Offsets 108 tonnes of CO2 every year

100 kW

Wind Turbine for Stewart Tower Dairy

Configuration:  1 NPS 100C – 21 – 37

Result: Stewart Tower Dairy countered skyrocketing electricity bills by installing an NPS 100-21 turbine

Power expenditure is now stabilized against the volatile and escalating costs of the energy market.

100 kW

Wind Turbine for Newington Farm

Configuration:  1 NPS 100C – 21 – 37

Result: The installation was optimized for the farm’s specific needs, tip height under 40m, the turbine simplified the planning procedure.

The turbine produced 150,000 kWh in its first nine months from an average wind speed of 6 m/s.

Zero Upfront Investment

Deploy wind power without capital expenditure. Pay only for the energy you consume.

Fixed Energy Rates

Lock in predictable energy costs for 10-25 years, protecting against utility rate increases.

No Operational Risk

NPS handles all maintenance, performance guarantees, and equipment risk.

Flexible Structures

On-site, off-site, virtual PPAs, and sleeved arrangements to match your needs.

PPAs

Wind Energy Without Capital Investment

Deploy on-site wind generation through a Power Purchase Agreement (PPA). NPS develops, finances, and operates the wind farm while you purchase the energy at fixed, below-market rates.

Ideal for industrial facilities, commercial operations, and institutions seeking to reduce energy costs and carbon footprint without upfront investment.