Northern Power Systems

NEWS 06.20.11

Olympic Steel Installs a Northern Power 100 Wind Turbine

Olympic Steel Inc., a national metals service center, says it has installed a $550,000 Northern Power 100 kW wind turbine that will supplement electricity to the company's corporate office and attached temper mill facility in Bedford Heights, Ohio.

The gearless, direct-drive designed turbine is mounted atop a 120-foot monopole and features a 69-foot diameter rotor. The unit is expected to supplement approximately 15% of the electric power consumed by the company's location with any excess production directed to the local energy grid, which is managed by First Energy.

Click here to read the full story by North American Windpower.

Copyright ©2011 Northern Power Systems. All rights reserved.spacerPrivacy Policy | Sitemap